Create a new high-density parts department

Our client, a leading car dealership group, required our design input into a new dealership they were building.

Following an initial site meeting and a review of their stockholding needs, it was decided that a mezzanine floor would form the basis of the project. This allowed for parts department shelving to be installed on the ground floor with larger and slow-moving items stored on the mezzanine floor level.
With such a wide range of products needed to be stored we used a variety of shelving systems with useful accessories such as lockable bay doors, shelf dividers and plastic containers.

This created a bespoke solution for the client that can be expanded or reconfigured if their needs change on the future.