Location

Reading, Berkshire

Lead Time

4 weeks

Products

  • Pallet Racking
  • Mezzanine Floor
  • Fire Rated Suspended Ceiling
  • Euro Shelving

Time on site

4 days

H-Racks were awarded a contract to supply storage equipment at a new distribution centre in Reading.

A fully fire protected mezzanine floor was installed to create additional floor space at the site.

H-Racks installed Link 51 pallet racking into the warehouse.

Euro Shelving with shelf dividers was required to create a pigeon hole system for order picking and stock segregation.

Other Case Studies

Free on site advice and consultation to understand the specific requirements of
each client

Call Us Now
Back To Top
andy@h-racks.co.uk
whatsapp